CommercialSolarEV Get a Quote

EV Charging Cost Calculator for Business: Solar, Grid or Public

This EV charging cost calculator compares what a business pays to run its vehicles from public chargers, from its own grid supply, and from a solar array it owns. It uses published 2026 prices and modelled solar output for eight UK cities — and the hours the vehicles are actually parked, because that decides how much of an array a vehicle can use. Change any box to match your own bill or quote.

Calculate your vehicles’ charging cost

The starting values are an illustrative depot: ten vans, 12,000 miles each, charged while parked 10:00–16:00 on weekdays, with a 30 kW array in London. Results update as you type; nothing you enter leaves your browser.

28%of vehicle energy supplied by your array (solar-following)
21.6p → 9.7p → 7.6pper mile: public charger → your site on grid power → your site with solar
27,129 kWharray output a year against 48,000 kWh of vehicle demand (ratio 0.57)

What the vehicles cost to run each year

Where the kWh comes fromCost a yearPence per mile
Public chargers at 54p/kWh£25,92021.6p
Your site, grid power only at 24.14p/kWh£11,5879.7p
Your site, grid + array — solar kWh counted at the array’s lifetime capital cost (5.5p/kWh)£9,0737.6p
Your site, grid + array — solar kWh counted at the export payment you give up (5p/kWh)£9,0087.5p

What the array earns

Array cost£35,010 (30 kW × £1,167)
Solar energy into vehicles13,474 kWh a year; 13,655 kWh a year left over (exported, or used by the building)
Yearly value if only the vehicles use it£3,935 (vehicle kWh at the grid price, the rest at the export price)
Simple payback on that basis8.9 years before tax relief, finance and maintenance
Payback if the building used every kWh5.3 years (output valued at the grid price)

Control matters. With plug-in-on-arrival charging the same array would supply 15% of vehicle energy instead of 28%. The difference is when charging happens, not how much the array produces.

How the EV charging cost calculator works

  1. Vehicle energy. Vehicles × miles per vehicle × kWh per mile. The kWh figure is measured at the wall, so charging losses are already inside it. The car preset is 0.294 kWh a mile, the 3.4 miles per kWh that Zapmap’s own per-mile conversions imply; the van preset (0.40 kWh a mile) is an illustration, not a published figure — use your own vehicles’ data.
  2. Array output. Array kW × the yearly yield for the city you choose: 759 to 951 kWh per kW across the eight cities, from PVGIS hourly data for 2005–2023 at a 10° pitch facing south with 14% system losses.
  3. Solar share. The calculator divides array output by vehicle energy and looks up what fraction of the vehicles’ energy that array can supply when vehicles are plugged in only during the window you choose. Those lookup tables come from an hour-by-hour simulation described below.
  4. Cost per source. Public chargers and grid power are energy × price. Solar kWh are valued two ways: at the array’s lifetime capital cost per kWh (array cost ÷ 25 years of output with 0.5% a year degradation) and at the export payment you give up by not sending them to the grid.
  5. Payback. The array’s yearly value is counted as vehicle kWh at your grid price plus everything left over at your export price. That is deliberately cautious: it assumes the building uses none of the rest. The last row of the results shows the payback if it used every kWh.

Why parking hours decide how much solar a vehicle can use

A solar array only produces in daylight, and most of its yearly output arrives in the middle of the day and in summer. A vehicle can only use electricity while it is plugged in. For a fleet that is parked at the depot overnight, almost none of the array’s output falls inside the window. The simulation behind the calculator puts numbers on that for London:

When vehicles are plugged inShare of the array’s yearly output that falls in that windowArray = 0.25× yearly vehicle demandArray = 0.5× yearly vehicle demandArray = 1× yearly vehicle demandArray = 2× yearly vehicle demand
Workplace parking 09:00–17:00, Mon–Fri60%15%30%56%77%
Daytime depot dwell 10:00–16:00, Mon–Fri50%12%25%49%73%
Overnight depot 18:00–07:00, Mon–Fri evenings3%1%1%3%6%

Read the table across. For a workplace where cars are parked 09:00–17:00 on weekdays, about 60% of an array’s yearly output is produced while they are there. An array whose yearly output equals half the vehicles’ yearly demand can supply about 30% of their energy; an array equal to their whole demand about 56%, because on summer weekdays it produces more than the cars can absorb. For vehicles parked only from 18:00 to 07:00, just 3% of the array’s output falls in the window, so even an array as large as the vehicles’ annual demand supplies about 3% of their energy. Without a battery, an overnight fleet gets almost nothing from solar; the value of the array then comes from what the building uses and exports.

Smart charging changes the answer

The same array supplies much less if chargers simply start at full power when a vehicle arrives. The model compares solar-following control — each hour’s charging is taken from the array first, with the grid topping up before departure — with plug-in-on-arrival, where charging starts at 7 kW per vehicle and runs until the vehicle is full.

Parking patternArray size (× demand)Solar-following controlPlug-in on arrival, 10 kWh/vehicle/dayPlug-in on arrival, 30 kWh/vehicle/day
Workplace parking 09:00–17:00, Mon–Fri0.5×30%7%20%
Workplace parking 09:00–17:00, Mon–Fri1×56%13%36%
Daytime depot dwell 10:00–16:00, Mon–Fri0.5×25%8%21%
Daytime depot dwell 10:00–16:00, Mon–Fri1×49%16%40%

At an array half the size of yearly demand, solar-following control supplies 30% of a workplace fleet’s energy against 7% to 20% when chargers start on arrival, depending on how much energy each vehicle needs a day. Vehicles that need only a little energy charge in an hour or two after arrival, before the sun is at its best; the smart controller waits for the middle of the day. That difference is why solar-following control belongs in the charger specification — see how solar EV charging works and the load management guide.

The seasons matter more than the city

Where you are in Britain changes yield by about 759 to 951 kWh per kW a year, but it moves the solar share very little once array size is expressed against demand. Season moves it a lot. For the London workplace pattern:

Array (× demand)JanFebMarAprMayJunJulAugSepOctNovDec
0.5×12%19%30%43%44%47%46%40%35%23%14%10%
1.0×23%37%59%77%77%81%81%75%67%45%29%19%

An array equal to yearly demand supplies about 81% of workplace charging energy in July and about 19% in December; at half that size, about 47% in June and 10% in December. Across the eight cities the yearly figures at array size 1× for the workplace pattern fall between 53% and 56%:

CitykWh per kWp a year (10° south)Workplace 09–17, array 0.5×Workplace 09–17, array 1×Daytime depot 10–16, array 0.5×Daytime depot 10–16, array 1×
Birmingham86130%55%25%48%
Cardiff93230%55%25%48%
Edinburgh79030%54%25%48%
Glasgow75930%53%24%47%
Leeds84030%55%25%48%
London90430%56%25%49%
Manchester79330%54%24%47%
Southampton95130%56%25%49%

What the calculator leaves out

  • Building load. The array is treated as dedicated to the vehicles, with any surplus exported. A building that also uses daytime power will take some of the output; size the array for both, or use the payback line that assumes the building uses every kWh.
  • Minimum charging current. The charging standard IEC 61851 specifies a minimum charging current of 6 A per phase, which the evcc documentation turns into 1.4 kW single-phase and 4.1 kW three-phase. A fleet with several chargers can concentrate a small surplus on one vehicle at a time, which the model assumes; a site with one or two chargers and a small array will use less solar than shown unless the charger can switch between phases.
  • Batteries. No storage is modelled. A battery could move daytime output into an overnight window, at a cost the calculator does not estimate.
  • Weekends and holidays. Vehicles are assumed to need charging on weekdays only, with no bank-holiday exceptions.
  • Money you may also save or spend. Capital allowances, the Workplace Charging Scheme or Depot Charging Scheme, finance costs, inverter replacement and maintenance are all outside the calculation — see capital allowances for solar and chargers and the Workplace Charging Scheme.
  • Yields. The hourly series averages about 1.5% below the PVGIS multi-year figures quoted on our cost page (for example 904 against 920 kWh per kW for London).

Where the starting numbers come from

InputStarting valueSource
Grid electricity price24.14p per kWhDESNZ Quarterly Energy Prices, table 3.4.2, average non-domestic price including the Climate Change Levy, Q1 2026
Public charging price54p per kWh (3–49 kW); 77p (50 kW and above)Zapmap Price Index, August 2026 pay-as-you-go averages
Solar installed cost£1,167 per kWDESNZ Solar PV cost data 2025/26, non-domestic 10–50 kW mean (total installed capacity basis); larger arrays may cost less per kW
Array output759–951 kWh per kW a yearEU JRC PVGIS 5.3 hourly series, SARAH3 radiation, 2005–2023, 10° south-facing, 14% losses
Degradation and life0.5% a year over 25 yearsJordan & Kurtz (2013) median degradation rate; the 25-year life is our planning assumption
Export price5p per kWhOur assumption — change it to your tariff
Van energy use0.40 kWh per mileIllustration only — use your vehicles’ data

The calculator’s arithmetic was checked against an independent implementation on several hundred random scenarios before publication. Prices and costs checked 14 October 2026.

CALCULATOR FAQS

EV charging cost calculator questions

How do I calculate the cost of charging an electric vehicle?

Multiply the energy the vehicle draws from the charger by the price per kWh. Energy is roughly miles × kWh per mile: a car using 0.294 kWh a mile (3.4 miles per kWh, the figure Zapmap’s per-mile conversions imply) costs about 7.1p a mile at the 24.14p average non-domestic price, 15.9p at a 54p public standard charger and 22.6p at a 77p public rapid charger.

How much does it cost to charge an electric van at a depot?

At an illustrative 0.40 kWh a mile, a van doing 18,000 miles a year uses 7,200 kWh. That costs about £1,738 at 24.14p per kWh on a depot supply, against £3,888 on public standard chargers (54p) or £5,544 on public rapid chargers (77p). Use your own vehicles’ consumption in the calculator.

Is solar charging cheaper than grid charging?

Per kWh, yes: an array’s lifetime capital cost is about 5.5p per kWh in London at £1,167 per kW, against 24.14p for grid power. But only the kWh produced while vehicles are plugged in count. A workplace fleet parked 09:00–17:00 with solar-following charging and an array half the size of its demand gets about 30% from solar; vehicles parked overnight about 3% even with a much larger array.

Does the calculator include grants or tax relief?

No. See the Workplace Charging Scheme, the depot charger grant and the capital allowances guide; deduct what applies to you from the capital cost.

How accurate is the calculator?

It is a planning model, not a quotation. Solar output varies from year to year: London’s yearly output ranged from 861 to 978 kWh per kW between 2005 and 2023 (lowest in 2021, highest in 2022), a spread of about 14%. The model also assumes weekday-only charging, no building load and no battery. Use it to compare options, then confirm with half-hourly data.

Sources

  • DESNZ, Quarterly Energy Prices, table 3.4.2 (non-domestic electricity prices including CCL), Q1 2026.
  • Zapmap Price Index, August 2026 — zapmap.com.
  • DESNZ, Solar PV cost data 2025/26 (published 28 May 2026) — gov.uk.
  • EU Joint Research Centre, PVGIS 5.3 hourly time series (SARAH3 radiation, ERA5 meteorology) — JRC PVGIS.
  • Jordan & Kurtz, “Photovoltaic Degradation Rates — An Analytical Review”, Progress in Photovoltaics 21(1), 2013 — doi.org/10.1002/pip.1182.
  • evcc documentation, “Solar surplus charging” (6 A minimum current under IEC 61851; 1.4 kW single-phase, 4.1 kW three-phase) — docs.evcc.io.

Free combined feasibility

Get combined solar + EV charging figures for your site

Tell us about the site and the vehicles. The reply is a written desk feasibility — array size, charger plan, grid headroom, grant and tax position — within 7 working days, from twelve months of meter data if you have it. No site visit is needed for that first pass.

Why we ask: the site type, charging scale and postcode are what set the array yield, the charger mix and the grant rules — without them any figure is generic. Commercial Solar EV is an independent information site operated by SEO Dons Ltd; it is not an installer. If a project goes ahead we can introduce an installer, with your permission. See the privacy notice and how this site is run.